Back to top
+918037745011
Send SMS Send Inquiry

PSC Girders Form Work/ Shuttering

PSC Girders Form Work/ Shuttering are useful for girder bridge construction and have an exclusive method to adopt. These facilitate coiled connection between PSC girders. The said products find extensive usage in railways. Also, these work as the superstructure for bridges. PSC Girders Form Work/ Shuttering are also utilized in metro rail projects. These quality finished girders are widely demanded in the construction as well as maintenance. The said products are useful in several conditions. These are pre-stressed to withstand the load made during the process of construction. Also, these are useful for the process of slabbing or packing.

Product Image (09)

NHAI- Metro Rail Project

Price: 1.1onwards INR/Kilowatt
  • Delivery Time:2-5 Days
  • Supply Ability:100 Per Month
Product Image (09)

Metro Rail Project

Price: 1.1onwards INR/Kilowatt
  • Delivery Time:2-5 Days
  • Supply Ability:100 Per Month
X